Roadmap: phase E done 1df1d57a919c
- Author
- Andy McCall @andymccall <[email protected]>
- When
- · 2026-09-27 19:12 UTC
- Signature
- ✔ signed by Andy McCall
- Hash
1df1d57a919ccd9c104d968c7fe0f7dc4403e66d95ec5a6de2f628ed697a5ea5- Depends on
- 4213c41dfc64 b0e64e81e4fb
- Depended on by
- f556a3ba8a9d ade1b26331d8 3faccd90ddfa
- In bookmarks
- agents-in-readme bare-hashes carried-not-removed carry-identical doctor-trust identical-sides keyless-tags main merge-remote-bookmark only-help-103 paths-for-resolutions-and-amend push-notes show-stat subrepo-pin-state switch-says
- In tags
- v0.1.0 v0.10.0 v0.11.0 v0.2.0 v0.3.0 v0.3.1 v0.4.0 v0.4.1 v0.4.2 v0.4.3 v0.4.4 v0.4.5 v0.4.6 v0.5.0 v0.5.1 v0.6.0 v0.7.0 v0.8.0 v0.9.0
- Edits
- 1 atom, 0 tree operations, 1 file
Browse the tree at this change
modified docs/roadmap.md +1 −0
| … | 47 unchanged lines |
||
| 48 | 48 | - 2026-09-27: roadmap written; phase A done the same day (challenge signatures, push report, `Send` states with the hub's cache, shared lanes and `log_window`). |
|
| 49 | 49 | - 2026-09-27: phase B (hub 0.2, accounts and access) done and deployed; phase C, the review checkpoint, is Andy's to commission. |
|
| 50 | 50 | - 2026-09-27: phase D done ahead of the review at Andy's request (`oxy seal --proposal`, `oxy proposal show|land`, seal-only pushes; hub 0.3 proposals and review). Review findings will be folded into D's code as plan items. |
|
| 51 | + | - 2026-09-27: phase E (hub 0.4, issues and notifications) done and deployed; next is F (hub 0.5 API, webhooks, checks, and the extension's exported API). |