Boards keep the last fortnight of finished work (#293); an issue's
references without the line or the repeats (#318); the new proposal form
and Draft with Claude's title (#315, #316); oh proposal ready (#313); a
waiting WASM job's reason (#317); claims with the expected time
(oxygenflow#76); CI test reports and coverage (#307). Changelog dated.
- **Boards keep the last fortnight of finished work (#293):** by default every column archives its finished cards (closed issues, closed or landed proposals) 14 days after they reached it, hourly, so a Done column stops growing however long a project runs; open work and notes stay. A column can instead archive every card after N days, or never ("Archive automatically" in its menu). Archived cards stay on the board's archive view, searchable and restorable. On the next hourly pass, boards with years of Done cards (Super Mario Land 2's 327) shrink to their last two weeks.
8
10
- **An issue's references: no line through the chips, each change once (#318):** an opened "referenced by N changes" box drew the proposal timeline's vertical rule through its first column (the events shared its class); and a change was recorded again for every bookmark it was pushed on, and for every mention in its message, so one change filled several chips. Now one reference per change per issue or proposal, and the page shows each change once, including those recorded before.
9
11
- **Claims say how long a job is expected to take (oxygenflow#76):** `expected_ms`, the median of the job's last five passing runs in the repository (reused passes left out), so a runner leaving with notice finishes a job that fits it and hands back the rest. Pins OxygenFlow's main.